Design Calculation of Pile Cap
may 07, 2020
Pile Cap of Two Piles:
Here, Pile value of 18 in diameter, 55 ft long, pile load is 80 kips, and 105 kips on column.Plan of Pile Cap |
- Step 1: Moment
Load on each pile = 105/2 =52.5 kips
M = 52.5 × (2.25-.5) = 92
- Step 2: Depth
- Step 3: Steel
- Step 4: Shear
Provide, ΓΈ 10 mm @ 6.5 in c/c
Section of Pile Cap |
Main bar (Bottom) marked (a) 7 - 20 mm dia
Stirrup bar marked (b) 10 mm dia (2-leg) @ 6.5" c/c.
Top bar marked (c) 6 - 12 mm dia.
Pile Cap of Three Piles:
Here, Pile value of 18 in diameter, 55 ft long, pile load is 80 kips and 220 kips on column.Pile Cap of Three Piles |
- Step 1: Moment
Load on each pile = 74 kips
M = 74× (1.9167’) = 142
- Step 2: Depth
- Step 3: Steel
- Step 4: Shear
Plan of Pile Cap |
Section of Pile Cap |
Mail bar (Bottom) marked (a) 8 - 20 mm diameter
Top bar marked (b) 1 -12 mm diameter at each corner